
A construction update often leads with a number. For our Bandra Project, the more interesting detail is what that number covers.
On 28 October 2026, Vascon Engineers announced that it had received a Letter of Intent from Neobridge Realty LLP for shell and core works valued at ₹72 crore, excluding taxes. The disclosure offers buyers and channel partners a closer look at the structure and essential systems included in this phase of our Bandra Project.
What goes into shell and core work?
Think of a concrete column in a finished lobby. Its surface might catch your eye, but the concrete and steel inside it do the work of carrying the building’s loads.
Reinforced concrete is one of the key elements identified in the construction package for our Bandra Project.
The scope also includes anti-termite treatment and sewage treatment plant works. These serve different purposes: anti-termite treatment helps protect the building, while the sewage treatment plant manages wastewater.
Together, these elements highlight the essential construction work that takes place behind the finished surfaces of a residential building.
How should readers interpret the 25-month period?
Vascon’s disclosure specifies 25 months for the work covered by the Letter of Intent.
For buyers and channel partners following our Bandra Project, it is important to understand that this timeline relates to the construction package and should not be interpreted as the project’s possession date.
The announcement provides a duration for the specified construction work without confirming a handover date.
What does this milestone tell us?
For anyone following our Bandra Project, the update answers three practical questions:
Who received the Letter of Intent?
What construction work does it cover?
How long is the specified work expected to take?
The ₹72 crore construction package gives a clearer picture of the structural and essential infrastructure work planned for our Bandra Project, making this milestone more meaningful than just a construction value.